2004 WINTER DP NEWS FEATURE STORY: - DP award for world's largest coal terminal | Download (230.37 Kb) |
|
| |
2004 SPRING DP NEWS FEATURE STORY: - Early study key to land development | Download (931.16 Kb) |
|
| |
2005 AUTUMN DP NEWS FEATURE STORY: - Waste not...Want not | Download (329.98 Kb) |
|
| |
2005 WINTER DP NEWS FEATURE STORY: - Minimising infrastructure risk | Download (811.23 Kb) |
|
| |
2005 SPRING DP NEWS FEATURE STORY: - Key role for DP in major coal project, Gladstone | Download (548.29 Kb) |
|
| |
2006 AUTUMN DP NEWS FEATURE STORY: - Australia's largest road project, Eastlink | Download (529.92 Kb) |
|
| |
2006 SPRING DP NEWS FEATURE STORY: Water, where to now? | Download (530.2 Kb) |
|
| |
2006-2007 SUMMER DP NEWS FEATURE STORY: - World's deepest continuous barrier wall. | Download (847.25 Kb) |
|
| |
2007 WINTER DP NEWS FEATURE STORY: - New container terminal for Port Botany | Download (577.25 Kb) |
|
| |
2007-2008 SUMMER DP NEWS
FEATURE STORY: - On a Mission, challenges for proposed apartment building Mission Beach, QLD. | Download (821.12 Kb) |
|
| |
2008 WINTER DP NEWS
FEATURE STORY - DP Wins again Best Engineering Consulting Firm (<$50 million) in BRW Client Choice Awards. | Download (585.06 Kb) |
|
| |
2008-2009 SUMMER DP NEWS FEATURE STORY: Douglas Partners advises on the construction of the Koolan Island Sea Wall and the stabilisation of an iron-ore crusher. | Download (204.15 Kb) |
|
| |
2009 Winter/Spring DP NEWS FEATURE STORY: Darwin Waterfront Precinct undergoes redevelopment with Douglas Partners contributing by way of geotechnical services. | Download (487.24 Kb) |
|
| |
2010 SUMMER/AUTUMN DP NEWS
FEATURE STORY: Sydney Town Hall, Building the Education Revolution, Mackay Stadium, Contaminated Sites | Download (485.5 Kb) |
|
| |