Ranger Uranium Decline

Ranger Uranium Decline Douglas Partners designed and supervised construction of the Ranger Uranium box cut, tunnel portal and decline. The decline was 2220m long, 6m high by 5.5m wide. Initially Douglas Partners was asked to re-design the tunnel portal, previously designed by others. The re-design required a site investigation and re-design of the box cut. […]